PLTM Kalibumi I

Project Overview
The project is funded by KfW under the Hydropower Programme with a loan totaling EUR 69.7 million (≈USD 76.7 million). The total project cost, including both EPC and non-EPC expenses, amounts to USD 42.4 million. Currently, PLN is in the process of finalizing the Detailed Engineering Design. However, based on the updated feasibility study, there is a shortfall in the loan amount required to fully cover the EPC costs.
Project Code
PH-01-26-1124
Project Category
Financing Project
Technology
Hydro
Type of Project
OnGrid (connected)
Transmission/Generation
Generation
Location of project
Nabire Regency
Dedicated (province)
Central Papua
Development
Expected Year of CoD
2027