PLTS Sumenep 2

Project Overview
This project is photovoltaic land-based power plant located in Sumenep, East Java, Indonesia with capacity of 50 MWac. The expected date of Commercial Operational Date (COD) of the project is in 2027 and will be connected to the 150 kV grid system. The pre feasibility study of the project was completed by PLN Nusantara Power, Subholding of PLN, in 2023.
Project Code
PS-01-06-1124
Project Category
Structuring Project
Technology
Utility scale solar PV
Sub Technology
Ground mounted
Type of Project
OnGrid (connected)
Transmission/Generation
Generation
Location of project
Sumenep
Dedicated (province)
East Java
Development
Expected Year of CoD
2027