PLTS Sumenep 2

PT PLN Nusantara Power
0 Financier
0 Developer
15 November 2024 - 15:34
Image

Ringkasan Proyek

This project is photovoltaic land-based power plant located in Sumenep, East Java, Indonesia with capacity of 50 MWac. The expected date of Commercial Operational Date (COD) of the project is in 2027 and will be connected to the 150 kV grid system. The pre feasibility study of the project was completed by PLN Nusantara Power, Subholding of PLN, in 2023.

Kode Proyek

PS-01-06-1124

Kategori Proyek

Structuring Project

Teknologi

PV surya skala utilitas

Sub Teknologi

Dipasang di tanah

Jenis Proyek

OnGrid (terhubung)

Transmisi/Pembangkit

Pembangkit

Lokasi Proyek

Sumenep

Khusus (provinsi)

Jawa Timur

Pengembangan

Tahun CoD yang Diharapkan

2027