PLTM Riorita

Ringkasan Proyek
The project is funded by KfW under the Hydropower Programme with a loan totaling EUR 69.7 million (≈USD 76.7 million). The total project cost, including both EPC and non-EPC expenses, amounts to USD 26.6 million. Currently, PLN is in the process of preparing the Detailed Engineering Design. However, based on the updated feasibility study, there is a shortfall in the loan amount required to cover the EPC costs fully
Kode Proyek
PH-01-39-1124
Kategori Proyek
Financing Project
Teknologi
Hidro
Jenis Proyek
OnGrid (terhubung)
Transmisi/Pembangkit
Pembangkit
Lokasi Proyek
North Kolaka Regency
Khusus (provinsi)
Sulawesi Tenggara
Pengembangan
Tahun CoD yang Diharapkan
2027