PLTS Pemalang

Ringkasan Proyek
This project is photovoltaic land-based power plant located in Pemalang, Central Java, Indonesia with capacity of 50 MWac. The expected date of Commercial Operational Date (COD) of the project is in 2027 and will be connected to the 150 kV grid system. The feasibility study of the project was completed by PLN Nusantara Power, Subholding of PLN, in 2022.
Kode Proyek
PS-01-07-1124
Kategori Proyek
Structuring Project
Teknologi
PV surya skala utilitas
Sub Teknologi
Dipasang di tanah
Jenis Proyek
OnGrid (terhubung)
Transmisi/Pembangkit
Pembangkit
Lokasi Proyek
Pemalang
Khusus (provinsi)
Jawa Tengah
Pengembangan
Tahun CoD yang Diharapkan
2027